
From
Oak Head a 240 degree compass heading will take you to the harbor
entrance. Pleasant Harbor Marina is the second, larger marina when
entering the harbor. You'll see our transient docks, covered
moorage, then the fuel dock. We monitor channel 16 & 9 on the VHF radio
Use chart 18473; 18477; 18476.
Hood Canal
Bridge Clearance
From Department of
Transportation:
Vertical clearance is 31.4
feet at the west end and 50.7 feet at the east end (both are calculated
at a MHHW of 7.0).
From USCG Notice to
Mariners (week 44/09)
"Construction work on the Hood Canal Floating Bridge East Span has
reduced the vertical clearance limits for that span of the bridge. The
east transition span is sloped so that the landward side has the highest
vertical clearance. The new vertical clearances are 50.7 FT for the
bridge side and 52.9 FT for the landward side. This is a reduction of
approximately 4.3 FT. All vertical measurements are taken from Mean
High Water."
Request an opening: Call the bridge crew at
360.779.3233 or on VHF CH #13 at least one hour before the intended
opening.
Average opening time: 30 minutes, traffic delays may be
longer
Rock Warnings
Sisters, two substantial rocks about 200 yards apart, lie 0.4 mile south
of the Hood Canal bridge on the west side. The rocks dry at half-tide.
The southern rock is marked by a large lighted beacon, yet from time to
time an unwary boat manages to go up on these rocks. Watch your
navigation if you pass under the west end of the bridge.
|